Shower surround with glass doors.Shower door and sliding glass door.Acrylic shower-surround over existing tub and fixtures.Basement shower enclosureBasement toilet pump macerating systemThis bathroom was refurbished from the studs up including new walls, electrical, and plumbing (the heating board included). The shower and tub were included new drainpipes and riser. Finally, a new window was installed as wellTotal bathroom remodelingBasement sink and vanityBasement shower base and glass door.Vanity, toilet and tile floor installation.Full bathroom remodeling.Half-bathroom
New tub, fixtures and surround with subway tiles.
Complete Bathroom Remodeling
Full bathroom remodeling: Replacing old tub by a shower pan, new fixtures, toilet vanity and floor tile.
Half Bathroom Remodeling.
Half-bathroom Remodeling.Shower with slider and acrylic surround up to the ceiling.Shallow vanity and ten-inch rough in toilet (pressure flushing mechanism).New tub, fixtures and surround walls.
Partial bathroom renovation: floor, vanity and toilet.
Partial Bathroom Remodeling: Toilet, vanity, mirror and light.
Commercial half-bath Remodel: Toilet, vanity, medicine cabinet and light.
Vintage bathroom makeover: Some of the tile work was left intact:. A white accent tile was inserted into the tile wall a new floor replaced the old one. New toilet and sink were also upgraded.