Field stone pathway over gravel stone bed and a mortar bed.
Installation of rebar on pathway.
The rebar will be embedded on two inches of mortar
cement mix.
Building structural cinder block support for front steps.
Building a butress support column to reinforce
basement caving wall.
Cinder block was anchored to existing concrete slap
as per Structural Engineer specifications