Installation of marble floor & 6" marble border.
Installation of a pedestal sink, toilet and shower fixtures.
Installation of Spanish tile on shower walls.
Expansion of bathroom into attic landing
adding a second bathroom window (not visible).
Replacement of existing plumbing to accomodate new shower fixtures and tub.
Installation of shower surround with finish decor molding. Installation of shower door.
Gutting entire bathroom down to the studs and subfloor
Installation of new sheet rock, electrical wiring and fixtures. Replacement of baseboard heater, vanity, tub and commode.
floor and wall tile installation.
Installation of new linoleum floor and wallborder.
Remove old grout and re-grout shower wall area.
Re-caulk tub perimeter with mildew resistant silicone.
Framing and dividing bathroom.
Wiring and installation of electrical fixtures and bathroom fan.
Installation of sheet rock and tile floor.
Installation of pedestal sink and commode using pre-existing plumbing piping and vents
Replacing old plumbing and installation of new tub and shower fixtures.
Installation of tile on walls and linoleum on floor.
Installation of a commode.
Replacement of toilet unit.
Replacement of existing subfloor due to water damage. Installation of linoleum floor and baseboard molding.
Reset old commode.
Replacement of existing plumbing to accomodate shower new shower fixtures.
Installation of green sheet rock.
Tile was installed on a second phase.
Installation of a bathroom macerating pump.
The unit discards the wastewater coming from three sources:
A sink, shower and toilet (attached at the front of the unit) into the main located twenty feet from the pump and four feet from the ground.
Installation of a basement shower surround and door.
The wastewater was disposed by an adjacent pump.
Partial picture from a complete basement bahtroom remodeling.
This project required framing, sheetrocking and tiling besides all the plumbing, venting and electrical wiring.